Notification of Work on a Non-Scheduled Waterway
Registry Number
Application Title
Province
Waterway
Work Type
Brief Description
We are installing a temporary structure, inflatable floating obstacle course, that is 68m x 72.4m wide (including floating perimeter). The floating obstacle course will be connected to land by a 69.1m dock. We are unsure of the exact distance that the moorings must be in a minimum water depth of 2.5-3m - which will be determined when we have the mooring team out. There will be yellow, inflatable perimeter ring around the course with four yellow flashing lights at each corner. We will install this on June 14 and uninstall it on September 15, 2021 - leaving the moorings in the lake for the next season.
Method of Construction
We will be using licensed, insured mooring installer to install the moorings and to make sure the inflatable obstacle course is securely anchored.
Expected Construction Dates
Start Date
End Date
Site Location
Latitude
Longitude
Publication Date
Submission Date